The 3P aircraft model was started on the 28.08.12 and it was done on the 12.06.2013.
I started the texture on the same day, and saved the latest PSD, including just the russian textures on the
31.08.2013.
So it took me one year to finish it.
That´s also caused by different things, first i was very busy with school.
Second is i wasn´t amazed by the task
, not as much as i was with the Marder III M.
Third is I´m not used to model aircrafts. This is maybe the fifth aircraft i finished and the first i did for FH2.
I think it would be fair to say it can take 4-5 man days to finish the outer model.
That means 4 or 5 x 8 hours = 32 our 40 hours.
+
The same amount of time for the interior, good that Fred supported me with that very well.